In December 2023, Pivot undertook an extensive stability analysis of Marampa Mines Limited’s tailings storage facility. The project aimed to assess the structural integrity of the dam under different environmental and operational conditions.
Our team utilized geotechnical and hydrological modeling to evaluate potential risks such as dam break scenarios and slope stability under stress. The final report, delivered in August 2024, provided a comprehensive analysis of the facility’s stability, along with recommendations for reinforcement measures and safety improvements. This work contributed to ensuring the long-term sustainability and regulatory compliance of the tailings storage infrastructure.
The Results
- Dam Break Analysis Report, and
- Tailings Storage Facility Stability Analysis